PurposeThe Resource Availability page shows a summary of availability for staff in order to see who is available for resource planning. Both named staff and generic role assignments are shown in order to identify assignments made to roles which need to be distributed out to named resources. In the case of roles, their total availability shows as negative. Double-clicking on a cell opens a more detailed page in the Resource Allocations page showing all the assignments for the selected resource. This contains a tabbed page containing two views of the data: • Resource Availability
Each view uses the same set of filters above the tabbed page so you can quickly switch between the views if required.
This view shows the same information, but instead of showing availability, shows allocations. The allocations are shown graphically as a stacked histogram to help visualise the type of time that has been allocated. The different types of time are colour coded as: • Red – Absences which have been pre-booked in the timesheet.
The stacked bars are drawn against a scale of 100% utilisation, with the green part at the top showing available time. The percentage allocated is shown above the stacked bar. Note that the colour coding within the bar is the percentage of contracted hours allocated not the percentage of total time. For example, if a person has been overcommitted and has been allocated to work 120% of the time, 38 hours on project work and 10 hours on speculative work out of a total of 40 hours, then the bar will show 95% blue reflecting the 38 hours out of a possible 40 hours, not 80% (38 hours out of 48 in total) Double-click on a cell to drill down to view the allocated projects.
Before explaining the operation of this page, all the items shown on the page will be described. Alternatively, skip straight to the Operational==Resource_Availability_Operation} section.
Data Entry/Reference Guide This section describes each data item on the page.
Operation To view resource availability: • Make any selections for service, role , department etc.
Displaying a Chart When viewing the Resource Availability View, a chart may be displayed showing the resource requirements against the capacity. The chart depicts the totals currently displayed in the availability grid as a chart. By using filters this can be used to depict usage against capacity by service, role or overall. You cannot use this to show capacity for a group, because roles are not allocated by group so you would get the allocations for a group against capacity, but all the role requirements would show.