Multi Currency Overview

Note: This is only applicable if you have the ‘Multi Currency’ functionality registered and enabled. How to check

 

The Multi Currency functionality enables you to produce invoices in different currencies.

Before being able to create these invoices the following information needs entering into your system.

Setup

Navigation

Currency Codes

Windows Application > Setups > Control Codes > Currency Codes

Currency Conversions

Windows Application > Setups > Control Codes > Currency Conversions

Time-charge Rate Tables

Web Application > Setups > Staff Related Codes > Time-charge Rate Tables List

 

When the initial setup has been completed you will be in a position to proceed with the following;-

 

Assigning Hourly Rates Staff (for the custom rate tables)

You can assign custom hourly rates to staff member's via the Custom Rates tab page on the Staff Hourly Rates.

 

Assigning to Project / Tasks

Note:

The time-charge rate table must be linked to the currency code.

The currency is set at the project level. It is not possible for tasks to have different currencies however, it is possible for tasks to have different custom rates.

You can set a fixed currency conversion which will run for the length of the project. In this instance the fluctuating currency conversion figures are ignored.

Assigning difference currencies and rate tables to projects can be done via the Currency & Tax and Rate Table for Time-Charges sections of the Edit Project Invoicing Parameters.

You can change the Charge Rate Table on tasks via the Edit Task Fees page.

 

How the System uses the Figures

The following examples work with the Euro (€) currency with the system set with a Base currency of GBP (£).

 

In brief

The system records transactions using the currency conversion rate at the time of the timesheet date (Timesheets) and transaction date (Expenses). These lines are then updated with the appropriate currency conversion taken at the time of invoicing. The currency charge values are not changed; the currency conversion is only used to update the base rate charge values.

 

hmtoggle_plus1Time- charges

 

hmtoggle_plus1Staff / Project Expenses

Any images shown may be representative of the previous version of Timemaster

Report a problem

Please report any errors on this page to timemastersupport@equisys.com